Why does the City have a Phase II permit?
In 1990, the Environmental Protection Agency (EPA) required all medium and large cities with populations greater than 100,000 to obtain NPDES permits. These were called Phase I permits. In 1999, the EPA required small MS4s with populations greater than 10,000 to obtain NPDES permit coverage for stormwater discharges. These are the Phase II permits.