Show All Answers

1. What is the National Pollutant Discharge Elimination System (NPDES)?
2. What is the Municipal Separate Storm Sewer System (MS4)?
3. Why does the City have a Phase II permit?
4. What does the Phase II permit require?
5. What kind of sampling is the City required to do?
6. What are the Six Minimum Control Measures?